Crazy

| Construction start | June 2010 |
| Construction end | 15th July 2010 |
| Number of networks | 1 |
| Number of lifts | 3 |
| Number of paths | 7 |
This is the first ball machine that i uploaded with the internet.
It has 8 paths and 3 lifts.
The lifts are the following:
| - Double helix lift |
| - Wheel lift |
| - Chain lift |

