Apocalypse

| Construction start | 22nd June 2013 |
| Construction end | 10th January 2014 |
| Number of networks | 4 |
| Number of lifts | 6 |
| Number of paths | 16 |
Apocalypse was under construction from 22nd June 2013 until 10th January 2014. It measures 2,30 meters in width, 1,40 meters in depth and 2,45 meters in height.
It consists of 4 lift networks and 16 paths.
Enjoy the slideshow below!

